Solar Installation, Green Square
STS Structural worked with AGL to assist with the installation of a 66 kW photovoltaic solar system for this office building asset held within the Growthpoint Properties portfolio and located in the Fortitude Valley Gateway Precinct (~ 2km from the Brisbane CBD). With the building having been completed in 2013, a retrospective assessment of the […]
Solar Installation, Mountview Supermaket
The construction of a new supermarket in Redbank Plains called for the installation of a 300kWp solar installation onto the roof. STS Structural worked closely with AGL to provide the structural assessment of the roof system in order to confirm the suitability to support the weight of the panels, and the extra uplift loads induced […]
Komatsu Distribution Warehouse Racking
As part of the construction of Komatsu’s largest distribution centre in Australia, the 17,500sqm warehouse was fitted with fully automated racking and picking system. The racking systems were installed by BHD Storage Solutions with STS Structural providing the design (including seismic analysis), certification, and site compliance assessments. The types of racking provided on this project […]
Taco Bell Morayfield
STS Structural has successfully delivered multiple Taco Bell fast food restaurants around the Brisbane area for various builders. STS Structural worked with the construction team to help deliver an efficient Truecore® steel framed building, incorporating the experience of previous designs. Each fast food restaurant is custom designed for the site so are each unique, bringing […]
Taco Bell East Ipswich
STS Structural has successfully delivered multiple Taco Bell fast food restaurants around the Brisbane area for various builders. STS Structural worked closely with the design and fabrication team to provide the engineering design, certification, and on site structural compliance inspections for the Taco Bell at East Ipswich. The structure was made of Truecore® light gauge […]
Yarrabilba Fire and Rescue Station
STS Structural were engaged by the frame supplier to design and certify the Truecore® cold formed steel framing for the new Yarrabilba Fire and Rescue Station. The design integrated a cold-formed steel portal frame structure into a traditional steel framed building, with each construction style supporting the strengths of the other. This allowed delivery lead […]