<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Racking Archives - STS Structural</title>
	<atom:link href="https://stsstructural.com.au/tag/racking/feed/" rel="self" type="application/rss+xml" />
	<link>https://stsstructural.com.au/tag/racking/</link>
	<description>No fuss, structural engineering solutions to projects of any size</description>
	<lastBuildDate>Thu, 27 Mar 2025 04:02:35 +0000</lastBuildDate>
	<language>en-AU</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.9.4</generator>

<image>
	<url>https://stsstructural.com.au/wp-content/uploads/2021/11/STS-Favicon-80x80.png</url>
	<title>Racking Archives - STS Structural</title>
	<link>https://stsstructural.com.au/tag/racking/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Newman Road Industrial Estate Warehouse Racking</title>
		<link>https://stsstructural.com.au/newman-road-industrial-estate-warehouse-racking/</link>
		
		<dc:creator><![CDATA[Alan C]]></dc:creator>
		<pubDate>Thu, 27 Mar 2025 04:02:34 +0000</pubDate>
				<category><![CDATA[Portfolio]]></category>
		<category><![CDATA[Racking]]></category>
		<guid isPermaLink="false">https://stsstructural.com.au/?p=1718</guid>

					<description><![CDATA[<p>Newman Road Industrial Estate engaged STS Structural to provide an array of engineering services focusing on the structural assessment of two cold-formed steel storage systems. These systems facilitated the racking building approval process for a warehouse fit-out on site. Our team conducted an in-depth review of the imported cantilever and selective pallet racking systems, benchmarking [&#8230;]</p>
<p>The post <a href="https://stsstructural.com.au/newman-road-industrial-estate-warehouse-racking/">Newman Road Industrial Estate Warehouse Racking</a> appeared first on <a href="https://stsstructural.com.au">STS Structural</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Newman Road Industrial Estate engaged STS Structural to provide an array of engineering services focusing on the structural assessment of two cold-formed steel storage systems. These systems facilitated the racking building approval process for a warehouse fit-out on site.</p>



<p>Our team conducted an in-depth review of the imported cantilever and selective pallet racking systems, benchmarking their design performance and load capacities against the European Racking Federation Code of Practice (FEM 10.2.09) and Australian Standard AS 4084. Based on this analysis, we offered expert guidance on improving the load-bearing performance of the systems, ensuring they met the required operational and logistical standards without compromising storage efficiency.</p>



<p>Additionally, STS Structural provided ongoing support throughout the installation process, delivering safe assembly supervision and compliance inspections to ensure all systems adhered to regulatory standards.</p>



<figure class="wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex">
<figure class="wp-block-image size-large"><img fetchpriority="high" decoding="async" width="773" height="1030" data-id="1719" src="https://stsstructural.com.au/wp-content/uploads/2025/03/IMG_6560-773x1030.jpg" alt="" class="wp-image-1719" srcset="https://stsstructural.com.au/wp-content/uploads/2025/03/IMG_6560-773x1030.jpg 773w, https://stsstructural.com.au/wp-content/uploads/2025/03/IMG_6560-225x300.jpg 225w, https://stsstructural.com.au/wp-content/uploads/2025/03/IMG_6560-768x1024.jpg 768w, https://stsstructural.com.au/wp-content/uploads/2025/03/IMG_6560-1152x1536.jpg 1152w, https://stsstructural.com.au/wp-content/uploads/2025/03/IMG_6560-1536x2048.jpg 1536w, https://stsstructural.com.au/wp-content/uploads/2025/03/IMG_6560-scaled.jpg 1920w" sizes="(max-width: 773px) 100vw, 773px" /></figure>



<figure class="wp-block-image size-large"><img decoding="async" width="1030" height="773" data-id="1720" src="https://stsstructural.com.au/wp-content/uploads/2025/03/IMG_6562-1030x773.jpg" alt="" class="wp-image-1720" srcset="https://stsstructural.com.au/wp-content/uploads/2025/03/IMG_6562-1030x773.jpg 1030w, https://stsstructural.com.au/wp-content/uploads/2025/03/IMG_6562-300x225.jpg 300w, https://stsstructural.com.au/wp-content/uploads/2025/03/IMG_6562-768x576.jpg 768w, https://stsstructural.com.au/wp-content/uploads/2025/03/IMG_6562-1536x1152.jpg 1536w, https://stsstructural.com.au/wp-content/uploads/2025/03/IMG_6562-2048x1536.jpg 2048w" sizes="(max-width: 1030px) 100vw, 1030px" /></figure>



<figure class="wp-block-image size-large"><img decoding="async" width="773" height="1030" data-id="1721" src="https://stsstructural.com.au/wp-content/uploads/2025/03/IMG_6556-773x1030.jpg" alt="" class="wp-image-1721" srcset="https://stsstructural.com.au/wp-content/uploads/2025/03/IMG_6556-773x1030.jpg 773w, https://stsstructural.com.au/wp-content/uploads/2025/03/IMG_6556-225x300.jpg 225w, https://stsstructural.com.au/wp-content/uploads/2025/03/IMG_6556-768x1024.jpg 768w, https://stsstructural.com.au/wp-content/uploads/2025/03/IMG_6556-1152x1536.jpg 1152w, https://stsstructural.com.au/wp-content/uploads/2025/03/IMG_6556-1536x2048.jpg 1536w, https://stsstructural.com.au/wp-content/uploads/2025/03/IMG_6556-scaled.jpg 1920w" sizes="(max-width: 773px) 100vw, 773px" /></figure>



<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="773" height="1030" data-id="1722" src="https://stsstructural.com.au/wp-content/uploads/2025/03/IMG_6484-773x1030.jpg" alt="" class="wp-image-1722" srcset="https://stsstructural.com.au/wp-content/uploads/2025/03/IMG_6484-773x1030.jpg 773w, https://stsstructural.com.au/wp-content/uploads/2025/03/IMG_6484-225x300.jpg 225w, https://stsstructural.com.au/wp-content/uploads/2025/03/IMG_6484-768x1024.jpg 768w, https://stsstructural.com.au/wp-content/uploads/2025/03/IMG_6484-1152x1536.jpg 1152w, https://stsstructural.com.au/wp-content/uploads/2025/03/IMG_6484-1536x2048.jpg 1536w, https://stsstructural.com.au/wp-content/uploads/2025/03/IMG_6484-scaled.jpg 1920w" sizes="(max-width: 773px) 100vw, 773px" /></figure>



<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="773" height="1030" data-id="1723" src="https://stsstructural.com.au/wp-content/uploads/2025/03/IMG_6486-773x1030.jpg" alt="" class="wp-image-1723" srcset="https://stsstructural.com.au/wp-content/uploads/2025/03/IMG_6486-773x1030.jpg 773w, https://stsstructural.com.au/wp-content/uploads/2025/03/IMG_6486-225x300.jpg 225w, https://stsstructural.com.au/wp-content/uploads/2025/03/IMG_6486-768x1024.jpg 768w, https://stsstructural.com.au/wp-content/uploads/2025/03/IMG_6486-1152x1536.jpg 1152w, https://stsstructural.com.au/wp-content/uploads/2025/03/IMG_6486-1536x2048.jpg 1536w, https://stsstructural.com.au/wp-content/uploads/2025/03/IMG_6486-scaled.jpg 1920w" sizes="(max-width: 773px) 100vw, 773px" /></figure>
</figure>
<p>The post <a href="https://stsstructural.com.au/newman-road-industrial-estate-warehouse-racking/">Newman Road Industrial Estate Warehouse Racking</a> appeared first on <a href="https://stsstructural.com.au">STS Structural</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Komatsu Distribution Warehouse Racking</title>
		<link>https://stsstructural.com.au/komatsu-distribution-warehouse-racking/</link>
		
		<dc:creator><![CDATA[Alan C]]></dc:creator>
		<pubDate>Thu, 24 Feb 2022 01:50:44 +0000</pubDate>
				<category><![CDATA[Portfolio]]></category>
		<category><![CDATA[Racking]]></category>
		<guid isPermaLink="false">https://stsstructural.com.au/?p=1566</guid>

					<description><![CDATA[<p>As part of the construction of Komatsu’s largest distribution centre in Australia, the 17,500sqm warehouse was fitted with fully automated racking and picking system. The racking systems were installed by BHD Storage Solutions with STS Structural providing the design (including seismic analysis), certification, and site compliance assessments. The types of racking provided on this project [&#8230;]</p>
<p>The post <a href="https://stsstructural.com.au/komatsu-distribution-warehouse-racking/">Komatsu Distribution Warehouse Racking</a> appeared first on <a href="https://stsstructural.com.au">STS Structural</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>As part of the construction of Komatsu’s largest distribution centre in Australia, the 17,500sqm warehouse was fitted with fully automated racking and picking system. The racking systems were installed by BHD Storage Solutions with STS Structural providing the design (including seismic analysis), certification, and site compliance assessments. The types of racking provided on this project were:</p>



<ul class="wp-block-list"><li>Pallet racking up to 10m high, up to a rated bay capacity of 52t, using twin, and quad beams as necessary.</li><li>Cantilever racking to 9.5m high</li><li>Automated mobile racking to 7m high, comprising of pallet racks set on tracks that were cast into the slab, to act as an automated compactus style high density storage solution.<br>The main challenge overcome on this project was the earthquake actions, given the tall, slender, and heavily loaded nature of the racks. This combination pushed the racking well outside the standard scope of application. Unique and innovative design solutions were adopted, implementing custom stiffening and high capacity tie downs where necessary.</li></ul>



<p></p>



<p>Location: Wacol, Qld<br>Racking Supplier: BHD Storage Solutions</p>



<p><a href="https://www.tomkinscommercial.com.au/portfolio-item/komatsu-distribution-centre-wacol/" target="_blank" rel="noreferrer noopener">More project details</a></p>



<p></p>



<figure class="wp-block-gallery columns-2 is-cropped wp-block-gallery-2 is-layout-flex wp-block-gallery-is-layout-flex"><ul class="blocks-gallery-grid"><li class="blocks-gallery-item"><figure><img loading="lazy" decoding="async" width="900" height="675" src="https://stsstructural.com.au/wp-content/uploads/2022/02/STS-Structural-Komatsu-Wacol-1.jpg" alt="" data-id="1567" data-link="https://stsstructural.com.au/?attachment_id=1567" class="wp-image-1567" srcset="https://stsstructural.com.au/wp-content/uploads/2022/02/STS-Structural-Komatsu-Wacol-1.jpg 900w, https://stsstructural.com.au/wp-content/uploads/2022/02/STS-Structural-Komatsu-Wacol-1-300x225.jpg 300w, https://stsstructural.com.au/wp-content/uploads/2022/02/STS-Structural-Komatsu-Wacol-1-768x576.jpg 768w" sizes="(max-width: 900px) 100vw, 900px" /></figure></li><li class="blocks-gallery-item"><figure><img loading="lazy" decoding="async" width="900" height="675" src="https://stsstructural.com.au/wp-content/uploads/2022/02/STS-Structural-Komatsu-Wacol-3.jpg" alt="" data-id="1569" data-link="https://stsstructural.com.au/?attachment_id=1569" class="wp-image-1569" srcset="https://stsstructural.com.au/wp-content/uploads/2022/02/STS-Structural-Komatsu-Wacol-3.jpg 900w, https://stsstructural.com.au/wp-content/uploads/2022/02/STS-Structural-Komatsu-Wacol-3-300x225.jpg 300w, https://stsstructural.com.au/wp-content/uploads/2022/02/STS-Structural-Komatsu-Wacol-3-768x576.jpg 768w" sizes="(max-width: 900px) 100vw, 900px" /></figure></li><li class="blocks-gallery-item"><figure><img loading="lazy" decoding="async" width="675" height="900" src="https://stsstructural.com.au/wp-content/uploads/2022/02/STS-Structural-Komatsu-Wacol-5.jpg" alt="" data-id="1571" data-link="https://stsstructural.com.au/?attachment_id=1571" class="wp-image-1571" srcset="https://stsstructural.com.au/wp-content/uploads/2022/02/STS-Structural-Komatsu-Wacol-5.jpg 675w, https://stsstructural.com.au/wp-content/uploads/2022/02/STS-Structural-Komatsu-Wacol-5-225x300.jpg 225w" sizes="(max-width: 675px) 100vw, 675px" /></figure></li><li class="blocks-gallery-item"><figure><img loading="lazy" decoding="async" width="675" height="900" src="https://stsstructural.com.au/wp-content/uploads/2022/02/STS-Structural-Komatsu-Wacol-2.jpg" alt="" data-id="1568" data-link="https://stsstructural.com.au/?attachment_id=1568" class="wp-image-1568" srcset="https://stsstructural.com.au/wp-content/uploads/2022/02/STS-Structural-Komatsu-Wacol-2.jpg 675w, https://stsstructural.com.au/wp-content/uploads/2022/02/STS-Structural-Komatsu-Wacol-2-225x300.jpg 225w" sizes="(max-width: 675px) 100vw, 675px" /></figure></li><li class="blocks-gallery-item"><figure><img loading="lazy" decoding="async" width="900" height="675" src="https://stsstructural.com.au/wp-content/uploads/2022/02/STS-Structural-Komatsu-Wacol-4.jpg" alt="" data-id="1570" data-link="https://stsstructural.com.au/?attachment_id=1570" class="wp-image-1570" srcset="https://stsstructural.com.au/wp-content/uploads/2022/02/STS-Structural-Komatsu-Wacol-4.jpg 900w, https://stsstructural.com.au/wp-content/uploads/2022/02/STS-Structural-Komatsu-Wacol-4-300x225.jpg 300w, https://stsstructural.com.au/wp-content/uploads/2022/02/STS-Structural-Komatsu-Wacol-4-768x576.jpg 768w" sizes="(max-width: 900px) 100vw, 900px" /></figure></li><li class="blocks-gallery-item"><figure><img loading="lazy" decoding="async" width="900" height="675" src="https://stsstructural.com.au/wp-content/uploads/2022/02/STS-Structural-Komatsu-Wacol-6.jpg" alt="" data-id="1572" data-link="https://stsstructural.com.au/?attachment_id=1572" class="wp-image-1572" srcset="https://stsstructural.com.au/wp-content/uploads/2022/02/STS-Structural-Komatsu-Wacol-6.jpg 900w, https://stsstructural.com.au/wp-content/uploads/2022/02/STS-Structural-Komatsu-Wacol-6-300x225.jpg 300w, https://stsstructural.com.au/wp-content/uploads/2022/02/STS-Structural-Komatsu-Wacol-6-768x576.jpg 768w" sizes="(max-width: 900px) 100vw, 900px" /></figure></li><li class="blocks-gallery-item"><figure><img loading="lazy" decoding="async" width="900" height="675" src="https://stsstructural.com.au/wp-content/uploads/2022/02/STS-Structural-Komatsu-Wacol-7.jpg" alt="" data-id="1573" data-full-url="https://stsstructural.com.au/wp-content/uploads/2022/02/STS-Structural-Komatsu-Wacol-7.jpg" data-link="https://stsstructural.com.au/?attachment_id=1573" class="wp-image-1573" srcset="https://stsstructural.com.au/wp-content/uploads/2022/02/STS-Structural-Komatsu-Wacol-7.jpg 900w, https://stsstructural.com.au/wp-content/uploads/2022/02/STS-Structural-Komatsu-Wacol-7-300x225.jpg 300w, https://stsstructural.com.au/wp-content/uploads/2022/02/STS-Structural-Komatsu-Wacol-7-768x576.jpg 768w" sizes="(max-width: 900px) 100vw, 900px" /></figure></li></ul></figure>
<p>The post <a href="https://stsstructural.com.au/komatsu-distribution-warehouse-racking/">Komatsu Distribution Warehouse Racking</a> appeared first on <a href="https://stsstructural.com.au">STS Structural</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
